The following case studies provide examples of projects in which MGS products have been used.
The following case studies provide examples of projects in which MGS products have been used.
3 June 2020
MGS has supplied a Pagani TG63-150 for use in a large-scale infrastructure SI project near Glasgow to investigate a railway embankment up to 10m in height which had instability issues.
Download PDF10 March 2020
Demco’s specialist track drainage pipe TerraDrain 11 has been installed as part of upgrade works at Bletchingley Tunnel in Surrey. TerraDrain was used because it is approved for installation at
Download PDF4 July 2019
The modelling of the S&C at Southampton Station to incorporate a new track layout and drainage system. The project required 200m of 6ft TerraDrain collector drainage together with 12m of
Download PDF4 July 2019
The project involved refurbishment of Scarborough Station, track layout and the track drainage system. Work included Drainage run No.1: Cess drainage through Platform 5 from the outfall under the bus station
Download PDF4 July 2019
Network Rail identified the requirement for a major upgrade of the railway between Hastings and Ashford. A 9-week blockade centred on essential maintenance works in the Ore Tunnel, the refurbishment